Hybrid Solar Power Plant Local SCADA

42.38 MW hybrid solar power plant — 154 inverters, 12 substations, 20,000 I/O redundant system.

Hybrid Solar Power Plant Local SCADA

Technical Specifications

42.38 MW Capacity
154 x 330 kW Inverters
12 Substations
20,000 I/O Redundant License
IEC 60870-5-104 Integration
PR (Performance Ratio) Calculation
SMS and Email Notifications
Reporting

The local SCADA application developed for the 42.38 MW hybrid solar power plant manages 154 x 330 kW inverters and 12 substations. Uninterrupted operation is ensured with a 20,000 I/O redundant license.

Plant data is collected and analyzed through integration with the IEC 60870-5-104 protocol. The efficiency of the plant is continuously monitored through PR (Performance Ratio) calculation, and operators are instantly notified via SMS and email notifications.

Application Screenshots

SPP SCADA Monitoring Screen

SPP SCADA Monitoring Screen

SPP Detail Monitoring

SPP Detail Monitoring

Large Scale

A large-scale SPP project with 42.38 MW capacity, 154 inverters and 12 substations.

Redundant System

Uninterrupted operation is ensured with a 20,000 I/O redundant license.

Performance Analysis

The efficiency of the plant is continuously monitored through PR (Performance Ratio) calculation.

Notification System

Instant notifications are delivered to operators via SMS and email.

Would you like to learn more about this project?

Contact Us